Project: China Datang Group – Xuchang Longgang Power Generation Co., Ltd. (Yuzhou Power Plant)
Application Context: Electrification modernization of special‑purpose machinery within the power‑plant coal yard, characterized by high‑duty continuous site operations
Scope of Retrofit: Complete diesel‑to‑battery conversion for coal‑pusher machinery. A custom‑tuned electric powertrain and intelligent ECU voltage‑stabilisation modules were engineered to suit the site’s enclosed operating conditions. The original machine control logic was retained throughout the works to deliver non‑intrusive, code‑compliant equipment conversion.
Project Outcomes: The conversion resolved persistent issues of excessive exhaust emissions and high energy draw from fossil‑fuel driven yard assets. It aligns with the site’s green‑energy decarbonisation strategy and delivers substantial reductions in long‑term O&M and fuel expenditure. The installation has become a regional reference project for power‑plant machinery electrification.
Retrofit Hand‑over Site

Retrofitted Electric Machinery

Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Project: Hebi Coal Industry (Group) – Hebi Fenghe Power Generation Co., Ltd. (Fenghe Power Plant)
Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Project: Zhengzhou Yuneng Thermal Power Co., Ltd. (Yuneng Thermal Power Plant)
Pre‑retrofit Condition

Post‑retrofit Condition

Project: Guangxi Liuzhou Iron and Steel Group Co., Limited (Liuzhou Steel Group)
Project Context: Raw‑material handling and loading‑unloading operations within the steel plant site, featuring continuous heavy‑duty cycles under high‑load and high‑dust industrial working conditions
Retrofit Scope: Full power train electrification for on‑site heavy‑duty loaders, specifically optimized for the high‑intensity working cycles of steel manufacturing environments. The equipment’s heat dissipation and voltage stabilization protection systems are upgraded to ensure reliable performance under complex industrial conditions.
Project Outcomes: Complies with ultra‑low emission control standards for steel production facilities. Eliminates exhaust emissions and noise pollution generated by fuel‑powered equipment. Significantly improves continuous operation stability and effectively reduces overall energy consumption and operational costs for plant production.
Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Retrofit Site

Retrofit Site

Client Testimonials
Green Transition Gains Momentum: Diesel‑to‑Electric Retrofit Delivers New Impetus for Cost Reduction & Efficiency Improvement — Successful Launch of the First Batch Loader Retrofit Project at Liuzhou Steel Logistics Company
“In the old days, the fuel‑powered loader created deafening noise the moment it started up, consuming nearly 1,000‑yuan worth of fuel per working day. The retrofitted electric version runs almost silently. A full charge delivers 8‑hour operation for just over 100‑yuan of electricity, and handling is even smoother!” A ten‑year‑seasoned on‑site operator spoke highly of his newly‑retrofitted work machine at Liuzhou Steel Logistics Company.
Recently, the technical retrofit project for two loaders at Liuzhou Steel Logistics Company has formally passed acceptance and been put into commercial operation. This marks a solid and critical step taken by Liuzhou Steel Logistics Company in responding to national net‑zero targets and advancing large‑scale equipment renewal and green transition.
These two fuel‑powered loaders with over 8‑year service life have been transformed from high‑fuel‑consumption, high‑emission assets into zero‑emission, low‑energy‑consumption electric workhorses, bringing strong new impetus for cost‑efficiency optimisation and green development of the logistics arm.
Tightening national environmental regulations combined with ageing equipment exposed the fleet of legacy diesel loaders to multiple challenges: excessive fuel consumption, emission exceedances, rising failure rates and persistent high maintenance costs. Each unit incurred annual fuel costs in excess of RMB 180,000 plus maintenance expenditure of RMB 20,000. These costs eroded corporate profit margins. Moreover equipment breakdowns during peak production periods created risks to production continuity and material supply reliability.
Faced with these pain points, the management team of Liuzhou Steel Logistics Company resolved to pursue a green‑development path balancing economic benefits and social responsibility. Guided by the national Action Plan for Continuous Improvement of Air Quality, diesel‑to‑electric retrofit became the preferred technical solution.
This technical transformation is far from a simple powertrain replacement. It represents a comprehensive system‑level upgrade tailored to real‑world operating conditions. To guarantee the retrofitted equipment performs better and offers greater durability than the original units, senior engineering staff spent two‑weeks on‑site collecting and analysing key operational data including workload intensity, ambient temperature‑humidity and material characteristics. A stringent retrofit standard was established: no degradation in performance, enhanced safety protection.
Four core systems underwent thorough technical overhaul: ‑ A 260 kW permanent‑magnet synchronous motor is installed, delivering a 15% power uplift versus the original unit for smoother, jerk‑free operation. ‑ A high‑capacity 360 Ah lithium‑iron‑phosphate battery pack with integrated intelligent thermal management enables minimum 8‑hour stable operation within ‑20℃ ~ 55℃ ambient range, alongside 1‑hour fast‑charge emergency capability. ‑ The in‑house developed vehicle control unit (VCU) real‑time monitors 120 operational parameters and implements three‑level protection including alarm, power derating and emergency shutdown, acting as the “intelligent brain” for equipment safety. ‑ Given the heavy‑dust, high‑humidity and complex conditions at steel‑plant work sites, all core components are upgraded to IP67 ingress‑protection rating. The vehicle chassis is additionally coated with wear‑resistant and anti‑corrosive paint to substantially extend service life.
Project: Beijing Energy Group – Beijing Jingneng Power Co., Ltd. – Henan Jingneng Huazhou Thermal Power Plant
Project Context: Retrofit for regular‑operation non‑road mobile machinery including coal‑yard loaders at thermal power enterprises
Retrofit Scope: Complete batch electrification upgrade for coal‑yard loaders and coal pushers across the plant site. An intelligent energy‑management system is deployed as auxiliary equipment to meet environmental acceptance criteria for thermal‑power facilities.
Project Outcomes: Fully satisfies environmental inspection requirements for the thermal‑power sector. Delivers zero exhaust emissions and low‑noise operation within plant premises. Enables standardised batch retrofitting compliant with unified equipment‑upgrade specifications of large‑scale energy groups and supports a more formalised operation‑and‑maintenance system.
Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Project: China Datang Group Gongyi Power Plant
Pre‑retrofit Condition

Post‑retrofit Condition

Project: Datang Yuzhou (Xuchang Longgang) Coal Yard
Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Project: Datang Linzhou Coal Yard – China’s‑first 320‑class Coal Pusher Electrification Retrofit Project
Pre‑retrofit Condition

Post‑retrofit Condition

Pre‑retrofit Condition

Post‑retrofit Condition

Project: Datang Anyang Coal Yard
Pre‑retrofit Condition

Post‑retrofit Condition

Mining Truck
Pre‑retrofit Condition

Post‑retrofit Condition

CRRC Group – Inner Mongolia Railway Operation & Management Group
China’s first pure‑electric locomotive for medium‑and‑long‑haul mainline transport

In February 2026, China’s first pure‑electric locomotive built for medium‑and‑long‑haul mainline transport — also China’s pure‑electric locomotive with the largest‑capacity battery pack to date — was officially put into service on the Shayu Railway in Zhangjiakou, Hebei Province. It undertakes long‑distance coal transport over the 142‑kilometre route.
Featuring innovative three‑electric‑system technology, this new‑energy pure‑electric locomotive is equipped with an ultra‑large 4200 kWh lithium‑iron‑phosphate battery pack. A full fast‑charge takes 1.5 hours, and the battery delivers a cycle life exceeding 4,000 times.
Its kinetic‑energy recovery system achieves up to 75% recovery efficiency. The locomotive handles 2 600‑ton heavy‑haul operations on a 9‰ gradient and maintains stable performance at temperatures as low as ‑20 °C. Furthermore, it is fitted with an intelligent wheel control system to substantially boost operational safety and efficiency.
Following deployment of the battery‑electric locomotive, each unit delivers annual fuel‑cost savings of over CNY 6 million (approx. USD 890,000) and cuts carbon‑dioxide emissions by more than 300 tonnes. Over its full‑life‑cycle, carbon emission reduction reaches approximately 9 000 tonnes. It takes the lead in helping the Shayu Railway achieve its near‑zero‑carbon freight corridor objective and marks the official arrival of the pure‑electric era for China’s heavy‑haul medium‑and‑long‑distance railway transport.
Project: State Grid (Chifeng, Inner Mongolia) Heating Retrofit for Power Supply Station
Heated Area: 50000 m²
Core Parameter: Stable operation at ambient temperature as low as −37 °C








Project: Heating‑Supply Project for Meihekou Sports Center, Jilin Province
Building Area: 52000 m²
Core Parameters: Stable operation at ambient temperature as low as −32 °C; equipped with off‑peak thermal storage system, off‑peak power proportion 71%, full avoidance of on‑peak‑hour operation




Project: Xing’an League Danongtou Smart Fisheries R&D Centre (Land‑based Seafood Breeding Base)
Heated Area: 2 316 m² (workshop & office building)
Core Parameters: Stable operation at ambient temperature as low as −34 °C; constant water temperature for culture ponds: 24‑26 °C; workshop height: 6.7m



Project: Shuanghe Farm, Gannan County, Qiqihar, Shounong Group
Heated Area: 10003 m²
Core Parameters: Equipment footprint only 25 m²; supply‑water temperature: 80 °C; stable operation at ambient temperature as low as −37 °C




Project: Crude‑Oil Transportation Heating Project, Dongxin Oil Production Plant, Shengli Oilfield, Sinopec
Core Parameters: Produces high‑temperature hot water at 80 °C; heats crude oil to 55‑65 °C; stable operation at ambient temperature as low as −36 °C
Product Features: Integrated all‑in‑one design, compatible with standardized on‑site construction for oilfields, resolves pipeline blockages caused by low‑temperature crude oil in winter




Project: Space Heating and Tank‑Farm Heating, Sinopec Lubricants Beijing Site
Heated Area: 18000 m²
Core Parameters: Equipment footprint: 50 m²; tank‑farm supply temperature: 80 °C; stable operation at ambient temperature as low as −21 °C



Project: Heating and Cooling Project, Sinovac Biotech Tianfu Road Site, Beijing
Heated Area: 19200 m²
Core Parameters: Equipment footprint: 108 m²; supply‑water temperature: 55 °C; stable operation at ambient temperature as low as −18 °C




Project: Heating for Wash Tanks, Drying and Phosphating Line, Danfoss (Tianjin) Co., Ltd.
Core Parameters: Supply‑water temperature: 79 °C; under ambient temperature of −30 °C, the cleaning solution can be heated from 15 °C to 65 °C within 1.5 hours; constant temperature of cleaning solution: 60‑65 °C; drying‑zone temperature: 90‑95 °C
Energy‑saving Performance: Annual power saving exceeds 36%; annual electricity cost reduction of over RMB 200000
Payback Period: 2.5 years
Industry Award: 2022 Energy‑Saving Cup – Best Heat‑Pump Application for Industry & Agriculture
Project Scale: Phosphating tank capacity: 4 m³
Before Retrofit: Original heat source‑ gas‑fired boiler,After Retrofit:two‑stage high‑temperature heat pump
Core Parameters: Heat the phosphating solution from 5 °C to 45 °C within 2 hours; source‑side supply/return water: 75/70 °C
Payback Period: 3 years




Livestock & Poultry Farming Project
Heating Retrofit Project, Yanqing Pig Farm, Beijing
Heated Area:1000㎡
Core Parameters: Constant pen temperature: 20‑30 °C; minimum ambient temperature: −25 °C

Heating Retrofit Project, Qinhuangdao Pig Farm, Hebei
Heated Area:1000㎡
Core Parameters: Constant housing temperature: 20‑30 °C; minimum ambient temperature: −25 °C

Heating Retrofit Project, Zhongyan Ostrich Farm, Yanqing, Beijing
Heated Area:500㎡
Core Parameters: Constant poultry‑housing temperature: 22‑33 °C; minimum ambient temperature: −23 °C

Heating Retrofit Project, Honghu Service Area, Daqing, Heilongjiang
Heated Area:2700 ㎡
Core Parameters: Minimum ambient temperature: −36 °C

Heat‑Pump Retrofit Project, Changbai Mountain Open‑Air Hot Spring Resort Hotel, Jilin
Heated Area:4000 ㎡
Core Parameters: Minimum ambient temperature: −35 °C

Heat‑Pump Retrofit Project, Tieshan Forest Farm Office Building, Qitaihe, Heilongjiang
Heated Area:1500 ㎡
Core Parameters: Minimum ambient temperature: −38 °C

Heat‑Pump Retrofit Project, Jinsha Forest Farm Office Building, Qitaihe, Heilongjiang
Heated Area:2500 ㎡
Core Parameters: Minimum ambient temperature: −38 °C

Retrofit Project Located in Qingyang, Gansu Province
- Fan Jiachuan 40655 Drilling Team
- Distance to charging station: 118 km
- Caikouji Well Site
- Distance to charging station: 88 km
- Hejiapan Well Site
- Distance to charging station: 55 km
- Tai’e Well Site
- Distance to charging station: 60 km

Bohai Drilling, Tianjin|Bohai Drilling, Baoding Hebei|Wushen Banner, Ordos, Inner Mongolia
- Well West 36‑10‑7H (50649 Drilling Team)
- Distance to charging station: 30 km
- Well Huanghua‑Nandagang 46‑10H (50522 Drilling Team)
- Distance to charging station: 55 km
- Well Gao 77‑90X (50403 Drilling Team)
- Distance to charging station: 55 km
- Well Wushen Banner 2201
- Distance to charging station: 15 km



Oil‑to‑Electricity Retrofit Project, SPIC Henan Electric Power Co., Ltd., Qinyang Power Generation Branch
Project Scenario: Coal yard earth‑moving & heavy‑duty plant infrastructure operations
Retrofit Scope: Custom‑engineered electric retrofit solution for tracked bulldozers under heavy‑load and complex working conditions. Optimised for extended range and load‑bearing capacity to meet all‑weather, round‑the‑clock plant‑site operation requirements.
Project Value: This project addresses core technical challenges for electric retrofit of heavy‑duty construction machinery. It delivers substantial reductions in heavy‑equipment fuel consumption and enables central‑SOE energy enterprises to advance their green, low‑carbon transformation and upgrading.


Oil‑to‑Electricity Retrofit Project, Zhengzhou Coal Group, Xinmi Coal Mine
Project Scenario: Open-pit coal mine, earthwork transfer for industrial and mining enterprises, and regular equipment operations.
Retrofit Content: Specialized electric retrofit for mine loaders and coal pushers, with targeted optimization of equipment dust prevention, explosion protection and voltage stabilization to adapt to harsh mine operating environments.
Project Value: Complies with green mine construction standards, solves the pain points of high fuel consumption and high operation & maintenance costs of mine equipment, and improves the green production rating of industrial and mining enterprises.
Pre‑retrofit Condition

Post‑retrofit Condition

Oil‑to‑Electricity Retrofit Project, Wanji Holding Group Co., Ltd.
Project Scenario: The project covers open‑pit coal mines, earth‑material transfer activities for industrial and mining enterprises, and routine day‑to‑day equipment operations.
Retrofit Scope: It delivers specialised electric retrofit solutions for mine loaders and coal pushers. Equipment‑level optimisations including dust protection, explosion protection and voltage stabilisation are implemented to cope with harsh mine‑site operating conditions.
Project Value: The retrofit complies with green‑mine construction standards. It mitigates key pain points of excessive fuel consumption and high O&M costs of mining equipment and helps industrial and mining enterprises elevate their green‑production rating.
Pre‑retrofit Condition

Post‑retrofit Condition